Customization: | Available |
---|---|
After-sales Service: | Provide lifelong after-sales service |
Warranty: | 1 Year |
Still deciding? Get samples of US$ 3899/Set
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
ZXYZ-2012 Transformer On Load Tap Switch Tester can realize the on-load tap switch transition time, transition waveform, transition resistance, three-phase synchronization and other parameters measurement, is the ideal equipment for testing on-load tap switch. Note: the user is the on-load switch of capacity adjustment, please inform us in advance!
Technical Indicators
1. Three-phase constant current source charging, charging current: 3A/1A; 0.6 A / 0.2 A file
2. Port maximum voltage: 24V
3. Maximum range of transition resistance: 100 Ω
4. Transition resistance measurement range: 1A grade: 0.4 Ω ~ 20 Ω 0.2A grade: 10 Ω ~ 100 Ω
5. Waveform recording time: 300ms
6. Sampling rate: 30K
7. Time resolution: 0.1ms
8 resistance resolution: 0.1 Ω
9. Accuracy:
1) Transition resistance: ±5% reading ±0.1 Ω
2) Transition time: ±0.5% reading ± 0.2ms
10. Environmental conditions
1) Ambient temperature: -10 ~ 40ºC
2) Relative humidity: <85%RH
Product pictures